The aim of this study is to highlighted and summarized the main findings, results, and lessons learnt for the conducted assessment study, presents and develop propose upgrade system and focus on the recommendations and prepare an operational plan and manual for maintenance for the new upgraded system, Assignments in detail are lustrated as follow Prepare a status report for the existing system includes the following key steps:
* Analysis and assess the existing Electro-Mechanical system including connections, pumps, electrical-sensor floats and capacity.
*Highlight the main deficiency of the existing system.
*Quantity of the water discharge in normal and peak events.
Proposed upgraded system report includes the following works:
* Develop a proposed upgrade/ alternative system includes technical drawings.
* Prepare a detailed BoQ, specification and cost estimate.
* Prepare an operational plan and manual for maintenance